Track & Tracked Vehicle Assembly Guides
Here are all the current assembly guides for our robot kits.
To see the old assembly guides, please click here.
General | Tracks | Tri-Track Chassis | Johnny 5
General (Read these first.)| Read these first! |
Tutorial for preparation of the laser-cut Lexan used in the kits Tutorial for BASIC Atom Pro programming Tutorial for BASIC Atom Pro Studio programming Tutorial for Motor Wiring |
| TRK-01/02 Information 1 Assembly Guide for the Tracks |
| TTRK-KT Information 1 Assembly Guide for the Tracks 2 Assembly Guide for the Tri-Track Chassis Additional Information Tutorial for Bot Board II, Atom Pro 28, and PS2 Control |
| J5T-KT / J5C-KT Information 1 Assembly Guide for the Tracks 2 Assembly Guide for the Johnny 5 Chassis 3 Assembly Guide for the RH-01 Hands 4 Assembly Guide for the Johnny 5 Torso Additional Information Schematic Johnny 5 Schematic for SEQ Schematic Johnny 5 Schematic for Bot Board Note: The following tutorials were written for the Biped BRAT. However, the information included can be applied to a larger project like the Johnny 5. Tutorial for SSC-32 and SEQ-01 Tutorial for BlueSMiRF & SSC-32 for Vista & XP (WIDCOMM software) Tutorial for BlueSMiRF & SSC-32 with BlueSoleil Tutorial for WiPort and SSC-32 |