Track & Tracked Vehicle Assembly Guides
Here are all the current assembly guides for our robot kits.
To see the old assembly guides, please click here.

General | Tracks | Tri-Track Chassis | Johnny 5

General (Read these first.)
Read these first!
Tutorial for preparation of the laser-cut Lexan used in the kits
Tutorial for BASIC Atom Pro programming
Tutorial for BASIC Atom Pro Studio programming
Tutorial for Motor Wiring
Tracks
TRK-01/02 Information
 1 Assembly Guide for the Tracks
Tri-Track Chassis
TTRK-KT Information
 1 Assembly Guide for the Tracks
 2 Assembly Guide for the Tri-Track Chassis

Additional Information
 Tutorial for Bot Board II, Atom Pro 28, and PS2 Control
Johnny 5
J5T-KT / J5C-KT Information
 1 Assembly Guide for the Tracks
 2 Assembly Guide for the Johnny 5 Chassis
 3 Assembly Guide for the RH-01 Hands
 4 Assembly Guide for the Johnny 5 Torso

Additional Information
 Schematic Johnny 5 Schematic for SEQ
 Schematic Johnny 5 Schematic for Bot Board
Note: The following tutorials were written for the Biped BRAT. However, the information included can be applied to a larger project like the Johnny 5.
 Tutorial for SSC-32 and SEQ-01
 Tutorial for BlueSMiRF & SSC-32 for Vista & XP (WIDCOMM software)
 Tutorial for BlueSMiRF & SSC-32 with BlueSoleil
 Tutorial for WiPort and SSC-32